Concrete Tile to Metal Roof Conversion Wellington

Cost Factors, Consent Rules and the Re-Roofing Process

Home / Roofing Guides and Projects / Concrete Tile to Metal Roof Conversion in Wellington: Cost, Consent and Process

Replacing a Concrete Tile Roof With Metal in Wellington

Completed dark long-run metal roof on a Wellington hillside home

By the Metal Roofing Solutions team
Published 6 August 2026 · General information for Wellington-region property owners

Thinking about replacing concrete tiles with metal? The change can give a home a much lighter profiled-metal roof, but there is more to it than swapping one covering for another. We need to look at the framing, wind exposure, access, flashings and the condition below the tiles before confirming the right scope and price.

Most Wellington homeowners want clear answers to three questions: Will it work for this house? Do we need building consent? What is it likely to cost? This guide walks through those questions in practical terms, because no two roofs—or Wellington sites—are exactly the same.

When does converting a tile roof to metal make sense?

Conversion is worth assessing when an older tile roof has recurring leaks, cracked or displaced tiles, failing flashings, difficult-to-source replacement tiles, or maintenance needs across several areas. It may also suit an owner who wants to move to long-run metal as part of a wider renovation.

That does not mean every damaged tile roof needs replacement. A localised defect may still be repairable. The decision should follow a roof inspection that separates isolated faults from broader problems with the roof covering, junctions, support system or drainage.

If your immediate concern is a leak or visible damage, start with a professional roofing and re-roofing assessment. You can also use our Wellington roof checkup guide to understand what an inspection should cover.

What changes the cost of a tile-to-metal roof conversion?

There is no honest one-size-fits-all price for this work. Two Wellington homes with a similar floor area can still need very different roofing scopes. When we prepare a quote, these are the main things that affect it:

  • Roof area and geometry: hips, valleys, dormers, changes in pitch and complex junctions add detailing and labour.
  • Access and height: scaffolding, edge protection, restricted access and protection of neighbouring property affect the work plan.
  • Removal and disposal: the quantity of tiles, battens and other waste must be allowed for.
  • Condition below the tiles: framing, supports and concealed moisture damage can only be fully confirmed as the old roof is opened up.
  • Wind-uplift requirements: changing from a heavy roof to a lightweight roof requires the load path and fixings to be checked.
  • Roofing system: profile, metal substrate, coating, fasteners and warranty suitability should match the property’s environment.
  • Underlay, ventilation and insulation interfaces: the scope should state what is being retained, replaced or upgraded.
  • Flashings and drainage: valleys, ridges, penetrations, apron flashings, gutters and downpipes need project-specific detailing.
  • Design or consent work: council, design and documentation requirements vary with the proposed work.

A cheap headline number is not much help if it leaves out scaffolding, disposal, flashings or remedial carpentry. The sensible way to compare quotes is to put the written scopes side by side—not just the totals at the bottom.

Do you need building consent in Wellington?

Sometimes the work may be exempt, but there is no blanket “no consent required” rule. MBIE’s current Schedule 1 guidance lists replacing an old clay tile roof with profiled metal roofing in the same position as an example that can fall within the general repair and replacement exemption. The guidance also says higher uplift forces must be considered when changing from a heavy roof to a lightweight one.

That example is conditional, and all building work must still comply with the Building Code. A different roof design, structural changes, premature durability failure or work outside the exemption may change the answer. Confirm the proposed scope with the relevant council before work begins. For homes in the wider region, that may be Wellington City Council, Hutt City Council, Upper Hutt City Council, Porirua City Council or Kāpiti Coast District Council.

Roof work that affects a home’s weathertightness can also involve restricted building work. MBIE explains when to use licensed people for restricted building work. Ask the contractor who will design and carry out any restricted work, which licences apply and what records will be supplied.

Why wind uplift matters when replacing heavy tiles

Concrete and masonry tiles are much heavier than profiled metal roofing. A lighter roof reduces gravity load, but the change makes correct uplift resistance especially important. BRANZ guidance on replacing concrete or masonry tiles says wind uplift should be top of mind and points to the relevant structural connections in NZS 3604.

This is particularly relevant locally. Earth Sciences New Zealand’s Wellington climatology describes the region as generally windy, with the strongest conditions around its south-western tip. A conversion quote should therefore be based on the property’s actual wind zone, roof shape, height, exposure and existing load path—not a generic fixing pattern copied from another house.

Wellington coastal exposure and material selection

The right metal and coating depend on the site. The current New Zealand Metal Roof and Wall Cladding Code of Practice notes that the North Island’s south coast can be a particularly harsh marine environment because of onshore winds and salt-laden air.

That does not mean every Wellington address has the same corrosion category. Distance from salt water, elevation, shelter, prevailing wind and rain-washing all matter. Your quote should identify the proposed roofing product, fasteners and flashings, explain why they suit the address, and include the applicable manufacturer documentation and maintenance conditions.

How the conversion process usually works

  1. Site inspection and measurements. The roofer assesses the roof covering, framing that can be seen, flashings, drainage, access and signs of moisture entry.
  2. Scope, design and approvals. The proposed profile, material, fixings, support system and junction details are specified. Consent and restricted-building-work requirements are checked.
  3. Access and weather planning. Scaffolding or other fall protection is arranged, materials are scheduled and temporary weather protection is planned.
  4. Removal of the old roof. Existing tiles and redundant components are removed in controlled stages rather than leaving the whole building exposed.
  5. Inspection of the substrate and structure. Any concealed damage is documented. Framing connections, supports and the roof plane are addressed as required by the design.
  6. Installation of the new roof system. Underlay, supports, profiled-metal sheets, fasteners and flashings are installed to the specified system and current requirements.
  7. Drainage and junction checks. Valleys, ridges, penetrations, eaves, gutters and roof-to-wall junctions are checked as a connected weathertightness system.
  8. Completion documents and care advice. The owner receives the agreed records, warranties where applicable, photographs and maintenance information.

The programme depends on roof size, complexity, access, weather and any repairs discovered after removal. Ask for the expected sequence, how the home will be protected between stages and how variations will be approved.

A real Wellington tile-to-metal re-roof project

We completed the tile-to-metal re-roof shown below on a hillside Wellington home. The three photographs show the tiled roof we started with, the job part-way through, and the completed dark long-run metal roof.

Existing tiled roof before conversion to long-run metal roofing on a Wellington hillside home
Before
The existing tiled roof before conversion.
Tile-to-metal roof conversion in progress with original tiles beside newly installed long-run metal roofing
During
Original tiles beside newly installed profiled metal roofing.
Completed dark long-run metal roof on a Wellington hillside home
After
The completed dark long-run metal roof.

The middle photograph tells the most useful part of the story. You can see the original tiles beside the newly installed metal roofing, along with the scaffolding around the roof edge. A re-roof is a planned sequence: access, removal, preparation, weather protection, new sheets and the junction details all have to work together for that particular home.

View the full before, during and after project case study.

Concrete tile and long-run metal: what changes?

ConsiderationConcrete or masonry tile roofProfiled-metal conversion
WeightHeavy roof coveringMuch lighter covering; uplift and load-path checks become important
Defect patternIndividual tiles may crack, move or become hard to matchPerformance depends on sheets, fixings, coatings, flashings and detailing
Roof supportsExisting battens and framing suit the original tile systemSupports and fixing layout must suit the selected metal profile and design
Coastal exposureAccessories and flashings still need suitable materialsMetal, coating, fasteners and unwashed areas need site-specific consideration
MaintenanceInspect tiles, ridges, flashings and drainageInspect sheets, fixings, coatings, penetrations, flashings and drainage

Neither material is automatically “best” for every building. The useful question is whether the proposed system is correctly designed, specified and installed for this house and this Wellington location. Our Wellington roofing materials guide provides a broader comparison.

What should be included in the roofing quote?

  • the exact roof areas and components included;
  • tile and waste removal;
  • access, scaffolding and site protection;
  • the metal profile, substrate, coating, colour and thickness;
  • underlay, supports, fixings and key flashing details;
  • gutters, penetrations and any adjoining cladding work;
  • allowances or rates for concealed damage and other variations;
  • consent, design and documentation responsibilities;
  • start assumptions, estimated programme and wet-weather plan;
  • workmanship and product warranty information, including maintenance conditions;
  • cleanup, disposal, final inspection and completion records.

See all of our Wellington roofing and cladding services.

Frequently asked questions

Can a concrete tile roof be replaced with long-run metal?

Often, yes. The building, roof framing, wind uplift, support layout, pitch, junctions and site exposure must first be assessed. The conversion is more than swapping one surface material for another.

Do I need consent to replace roof tiles with metal?

Some like-for-like-position replacement work may be exempt under Schedule 1, but exemptions have conditions and every project must comply with the Building Code. Confirm the actual scope with the relevant council before work starts.

How much does a tile-to-metal roof conversion cost in Wellington?

Price depends on roof area and complexity, access, removal, hidden damage, structural and uplift requirements, the specified roofing system, flashings, drainage, and any consent or design work. A site-specific written quote is more reliable than a generic square-metre figure.

Will a metal roof be noisier in rain?

Noise depends on the whole roof assembly, including the ceiling, insulation, underlay, roof cavity and how the building is used. Ask the roofer to explain the proposed assembly rather than judging the metal sheet in isolation.

How long will the conversion take?

The duration depends on the roof’s size and geometry, access, weather, approvals and any repairs found after the tiles are removed. The quote should provide a project sequence and explain temporary weather protection.

Is it safe to inspect the roof myself?

Stay at ground level. Use photographs or binoculars for an initial look and leave roof access to competent people with appropriate controls. WorkSafe identifies falls as the most serious roof-work hazard, and wet or windy conditions add further risk.

Plan your Wellington tile-to-metal conversion

The best place to start is with the roof you actually have, not a generic roofing package. We can look at its condition, access and exposure, talk through what you want to achieve, and prepare a clear scope for a tile-to-metal conversion in Wellington, Lower Hutt, Upper Hutt, Porirua or the Kāpiti Coast.